Blackhawk Group's three-day engine overhaul and what it means for GA maintenance
Blackhawk Group has demonstrated a 72-hour bench overhaul for turbine engines, potentially cutting aircraft downtime from three months to two or three weeks.
TowerBlackhawk Group has demonstrated a 72-hour bench overhaul for turbine engines, potentially cutting aircraft downtime from three months to two or three weeks.
Tower