Blackhawk Group's three-day engine overhaul and what it means for GA maintenance
Blackhawk Group has demonstrated a 72-hour bench overhaul for turbine engines, potentially cutting aircraft downtime from three months to two or three weeks.
TowerBlackhawk Group has demonstrated a 72-hour bench overhaul for turbine engines, potentially cutting aircraft downtime from three months to two or three weeks.
TowerPratt & Whitney Canada is investing CAD $275M in its Longueuil plant, signaling decades of continued support for the PT6 turboprop.
TowerThe ThrustSense autothrottle by IS&S brings airline-standard engine failure protection to GA twins, addressing the deadliest failure mode in multi-engine flying.
VectorMerlin Labs is building a retrofit autonomy system that has already flown King Air turboprops with zero human intervention.
Vector