JetZero's $235 million Air Force contract to build a full-scale blended wing body demonstrator is the most credible step yet toward replacing the tube-and-wing design that has dominated aviation for nearly a century.
JetZero's $235M Air Force contract to build the Z-5 blended wing body demonstrator could reshape aviation economics - but commercial service is still a decade or more away.
JetZero's $235M Air Force contract targets a 2027 first flight for a full-scale blended wing body demonstrator promising 50% lower fuel burn than conventional airliners.
JetZero's Z-5 demonstrator, backed by a $235M Air Force contract, aims to validate a wing-body design that could cut narrowbody fuel burn by up to 50%.
JetZero's blended wing body aircraft could cut airliner fuel burn by 25-50%, with a full-scale prototype funded by the Air Force expected to fly in 2027.